Case Study: Wienerberger

Predictive maintenance solutions to make the smart home smarter

IBM is helping Wienerberger integrate digital components of the house and provide smart technology to complement the e4 principles (economy, energy, environment and emotion).

Case Study: Fully Integrated Utility Company

Addressing environmental health and safety through effective asset management using IBM Maximo

Discover how one Canadian utility company is controlling incident notifications and improving overall workflow with our industry leading enterprise asset management solution.

Case Study: Yanzi and Watson IoT

Creating a Connected Building in Under 4 Hours

Watch this building go from unconnected to smart in a matter of hours. See how IBM is uniquely positioned to transform data from building into business insight.

Case Study: US Railroad company

Smarter physical infrastructure software: Driving better business decisions

IBM Facilities management solutions for Smarter Physical Infrastructures help our clients make an overall improvement to operations and maintenance expenses, helping drive business model innovation.

Case Study: Apache Corporation

Providing governance capabilities across the information lifecycle

Working with IBM and IBM Business Partners McLaren Software and Integro, Inc., Apache implemented a range of capabilities from the IBM Information Lifecycle Governance software portfolio to help unify and manage electronic records, images, documents, and data in a centralized repository.

Case Study: Lafarge

Taking a predictive approach to managing costs

Lafarge is leveraging IBM Maximo Asset Management solutions to take a predictive maintenance approach to manage costs.

Case Study: Velenje Coal Mine

Real-time data streams improve control, help detect faults and prevent equipment failure

To prevent production delays, Velenje Coal Mine uses a powerful asset management solution to proactively prevent failure and support the continuous availability of its mining equipment.

  • 22% reduced production delays
  • 16% lower maintenance costs

Case Study: ThyssenKrupp Electrical Stee

ThyssenKrupp Electrical Steel forges ahead with integrated IBM, SAP and PSI solution

Working with IBM and SAP, ThyssenKrupp Elecrical Steel extended its existing SAP and PSImetals landspace to four additional locations, and implemented SAP Advance Planning and Optimization.

Would you like to speak with an IBM Manufacturing, Resources & Construction expert?